Wednesday, 14 August 2013
13 August - Concrete Slabs
Friday, 9 August 2013
Nearly ready to pour (concrete) 9.8.13
Surrounded by Geoff the groundworker's very neat crochet work with
reinforcement.
If they made transparent concrete I would specify it!
I
am nearly smiling because we are nearly out of the ground without
much rain or discovering a mine shaft, fingers crossed for a fine day on Tuesday when slabs are powerfloated.
The cantilever slab with supporting trench footing to the left - designed to avoid imposing loads on the party wall footings. Incoming mains water duct in blue and outgoing soil pipe.