13 August - Concrete Slabs



Concrete poured and levelled by 10am
Power floating early afternoon

Finished slabs
Severn Tunnel Junction at 6.30pm - Fortunately the rain stayed over the Welsh border all day


Friday, 9 August 2013

Nearly ready to pour (concrete) 9.8.13



Surrounded by Geoff the groundworker's very neat crochet work with reinforcement.
If they made transparent concrete I would specify it!
I am nearly smiling because we are nearly out of the ground without much rain or discovering a mine shaft, fingers crossed for a fine day on Tuesday when slabs are powerfloated.





The cantilever slab with supporting trench footing to the left - designed to avoid imposing loads on the party wall footings. Incoming mains water duct in blue and outgoing soil pipe.

Depression for the matwell




Sunday, 4 August 2013

Weekend Off!

Where ever I lay my head - overnight ferry Newhaven-Dieppe
Keith Haring Museum of Modern Art

Sparkling Water! at Parc Andre Citroen

Place de la Concorde at the bottom of Champs Elysees






Monets House at Giverny halfway between Paris & Dieppe
Monets lily pond at Giverny