Monday 15 July 2013

First Concrete Pour


Base concrete for the retaining wall to the high end of the site - pavement on the left and sloping yard to the rear.

Rear wall of the workshop with stepped reinforcement in place for the second pour of waterproof concrete.
The old concrete yard to the rear and old workshop slab to the right is being left in place to provide a storage area and avoid disturbing the neighbouring foundations.



Preparing the trench for the cantilever slab to support the new blockwork alongside the party wall